E. Uhlmann
Institute for Machine Tools and Factory Management, Technische Universität Berlin, Germany
H. Bochnig
Institute for Machine Tools and Factory Management, Technische Universität Berlin, Germany
C. Stelzer
Institute for Machine Tools and Factory Management, Technische Universität Berlin, Germany
Download articlePublished in: Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden
Linköping Electronic Conference Proceedings 77:51, p. 399-405
Published: 2012-10-11
ISBN: 978-91-7393-381-0
ISSN: 1650-3686 (print), 1650-3740 (online)
Industrial Product-Service Systems (IPS²) integrate product and service shares over the IPS² lifecycle to provide value and create solutions; which fulfil customer needs. To ensure potentials of IPS² the integration of the customer in the entire IPS² lifecycle is a key point to get a customized solution. With a support by an assistance system the interactive acquisition of customer needs can be done. A subsequent configuration of IPS² solutions; obtaining formalized and precise information; is shown. Together with the recommendation for an IPS² business model; the information’s form the IPS² requirement specification and thus the basis for further development processes.
Industrial Product-Service Systems; support; IPS² development; customer requirements; IPS² configuration
[1] Nyhuis; P.; Fronia; P.; Pachow-Frauenhofer; J.; Wulf; S.; 2009; Wandlungsfähige Produktionssysteme; wt Werkstattstechnik online; Jahrgang 99; Heft 4; p. 205-210; Springer-VDI-Verlag GmbH & Co. KG; Düsseldorf; ISSN 1436-4980.
[2] Fleischer; J.; Meier; H.; Kaiser; U.; Krings; R.; Niggeschmidt; S.; 2008; Verfügbarkeitsoptimale Dienstleistungskonfiguration; wt Werkstattstechnik online; Jahrgang 98; Heft 7/8; p. 601-606; Springer- VDI-Verlag GmbH & Co. KG; Düsseldorf; ISSN 1436-4980.
[3] Tan. A. R.; McAloone; T. C.; 2006; Characteristics of strategies in Product/Service-System Development; International Design Conference – Design 2006; Dubrovnik – Croatia; May 15-18.
[4] Matzen; D.; Tan A. R.; Andreasen; M.; 2005; Product/Service-Systems: Proposal for Models and Terminology; 16. Symposium “Design For X”; Neukirchen; October 13-15.
[5] Schuh; G.; Meyer; J. C.; 2009; Kundenorientierte Gestaltung von Lieferketten; wt Werkstattstechnik online; Jahrgang 99; Heft 4; p. 244-249; Springer- VDI-Verlag GmbH & Co. KG; Düsseldorf; ISSN 1436-4980.
[6] Uhlmann; E.; Meier; H.; Stelzer; C.; Geisert; C. Völker; O.; Krug; C.; 2009; Dynamic IPS² Networks and Operation Based on Software Agents; CIRP IPS² Conference (CIRP Industrial Product-Service Systems); 1-2 April 2009; p. 305-310; Cranfield; UK; ISBN 978-0-9557436-5-8.
[7] Tukker; A.; Tischner; U.; 2005; New Business for Old Europe – Product-Service Development; Competiveness and Sustainability; Greanleaf Publishing; Sheffield; UK.
[8] Müller; P.; Stelzer; C.; Geisert; C.; Uhlmann; E.; Knothe T.; 2008; Kernprozesse hybrider Leistungsbündel; wt Werkstattstechnik online; Jahrgang 2008; Heft 7/8; p. 581-586; Springer-VDIVerlag GmbH & Co. KG; Düsseldorf; ISSN 1436- 4980.
[9] Uhlmann; E.; Stelzer; C.; 2009; Core Process of IPS² Working state of corporate process modeling in SFB/TR29 – Planning; development and operation; Second International Seminar on IPS²; p. 37-41; Berlin; Shaker; ISBN 978-3-8322-8473-2.
[10] VDI 2206: Design methodology for mechatronic systems. Beuth Verlag; Berlin; 2004.
[11] VDI 2221: Systematic approach to the development and design of technical systems and products. Beuth Verlag; Berlin; 1993.
[12] Uhlmann; E.; Bochnig; H.; 2009; Computer Aided IPS² Development; Second International Seminar on IPS²; p. 31-36; Berlin; Shaker; ISBN 978-3-8322- 8473-2.
[13] Müller; P.; Kebir; N.; Stark; R.; Blessing; L.; 2009; PSS Layer Method – Application to microenergy systems; In: Sakao; T.; Lindahl; M. (Eds.); Introduction to Product/Service-System Design; p. 3- 30; ISBN 978-1-84882-908-4.