Michael Abramovici
Dept. of Information Technology in Mechanical Engineering, Ruhr-University Bochum, Bochum, Germany
Fahmi Bellalouna
Dept. of Information Technology in Mechanical Engineering, Ruhr-University Bochum, Bochum, Germany
Jens Christian Christian Goebel
Dept. of Information Technology in Mechanical Engineering, Ruhr-University Bochum, Bochum, Germany
Download articlePublished in: Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden
Linköping Electronic Conference Proceedings 77:60, p. 467-474
Published: 2012-10-11
ISBN: 978-91-7393-381-0
ISSN: 1650-3686 (print), 1650-3740 (online)
Compared to single physical products or services; IPS² are characterized by a very high degree of dynamic changes not only during their planning; but throughout their entire life cycle. These changes have to be managed; tracked and documented by a change management process and supported by a change management system. As IPS² changes and change processes are very difficult to plan during the IPS² development phase; existing static and deterministic change management solutions are not appropriate to be used for IPS². This paper describes a new concept of an adaptive change management for IPS². The concept described allows for appropriate redesigning; adaption and execution of change processes of IPS² throughout its entire life cycle to carry out an IPS² change most efficiently with regard to time and costs.
Industrial Product Service Systems (IPS²); Engineering Change Management (ECM); Adaptive Processes; Adaptability
[1] Datta; P. P.; Roy; R.; 2009; Cost Modelling Techniques for Availability Type Service Support Contracts: A Literature Review and Empirical Study; Proceedings of the 1st CIRP IPS² Conference; Cranfield; UK; 216- 223.
[2] Kernland; M.; Hoeffleur; O.; Felber; M.; 2008; The Agility Challenge in Business Process Management; in Product Data Journal; Vol 1/2008; ed. by Prostep iViP e.V.; Darmstadt; Germany; 40-42.
[3] Burmeister; B.; Arnold; M.; Copaciu; F.; Rimmassa; G.; 2008; BDI-Agents for Agile Goal-Oriented Business Processes; Proceedings of the 7th International Conference on Autonomous Agents and Multiagent Systems (AAMAS 2008); Estorial; Portugal.
[4] Ariyo; O.; Keller; R.; Eckert; C. M.; Clarkson; P. J.; 2007; Predicting Change Propagation on Different Levels of Granularity: An Algorithmic View; Proceedings of the International Conference on Engineering Design (ICED 07); Paris; France.
[5] Jarratt; T.; Eckert; C.; Clarkson; P. J.; 2004; The Benefits of Predicting Change in Complex Products: Application Areas of a DSM-Based Prediction Tool; Proceedings of the International Design Conference (DESIGN 2004); Dubrovnik; Croatia.
[6] Eger; Tido; Eckert; Claudia M.; Clarkson; P. John; 2007; Engineering Change Analysis During Ongoing Product Development; Proceedings of the International Conference on Engineering Design (ICED 07); Paris; France.
[7] Conrad; Jan; Deubel; Till; Köhler; Christian; Wanke; Sören; Weber; Christian; 2007; Combining the CPM/PDD Theory and FMEA-Methodology for an Improved Engineering Change Management; Proceedings of the International Conference on Engineering Design (ICED 07); Paris; France.
[8] Amaral; D. C.; Rozenfeld; H.; 2007; Integrating New Product Development Process References with Maturity and Change Management Models; Proceedings of the International Conference on Engineering Design (ICED 07); Paris; France.
[9] El Hani; M. A.; Rivest; L.; Fortin; C.; 2007; Propagating engineering changes to manufacturing process planning: does PLM meet the need?; Proceedings of the International Conference on Product Lifecycle Management (PLM07); Milan; Italy.
[10] Pulkkinen; A.; Riitahuhta; A.; 2009; On the relation of business processes and engineering change management; Proceedings of the International Conference on Product Lifecycle Management (PLM09); Bath; UK.
[11] Tavcar; J.; Duhovnik; J.; 2004; Product Life Cycle Management in a Serial Production; Proceedings of the International Design Conference (DESIGN 2004); Dubrovnik; Croatia.
[12] Scheer; A.-W.; 2002; Vom Geschäftsprozess zum Anwendungssystem; 4. Auflage; Springer Verlag; Berlin; Germany
[13] Roa; A. S.; Georgeff; M. P.; 1995; BDI Agents: From Theory to Practice; Proceedings of the 1st International Conference on Multi-Agent Systems; San Francisco; USA.
[14] Verband der Automobilindustrie (VDA); 2006; VDA 4965: Engineering Change Management (ECM) – Part 1 Engineering Change Request (ECM); Frankfurt; Germany.
[15] Abramovici; M.; Neubach; M.; Schulze; M.; Spura; C.; 2009; Metadata Reference Model for IPS² Lifecycle Management; Proceedings of the 1st CIRP IPS² Conference; Cranfield; UK; 268-272.
[16] Abramovici; M.; Bellalouna; F.; 2008; Service Oriented Architecture for the Integration of Domain- Specific PLM Systems within the Mechatronic Product Development; Proceedings of the 7th International Symposium on Tools and Methods of Competitive Engineering; (TMCE 2008); Vol. 2; Izmir; Turkey; 941-953.
[17] Abramovici; M.; Neubach; M.; Fathi; M.; Holland; A.; 2009; Knowledge-Based Feedback of Product Use Information into Product Development; Proceedings of the International Conference on Engineering Design (ICED 09); Stanford; USA.
[18] Richter; A.; Sadek; T.; Steven; M.; Welp; E.G.; 2009; Use-Oriented Business Models and Flexibility in Industrial Product-Service Systems; Proceedings of the 1st CIRP Industrial Product-Service Systems (IPS²) Conference; Cranfield; UK.
[19] Sadek; T.; 2008; Ein modellorientierter Ansatz zur Konzeptentwicklung industrieller Produkt-Service Systeme; Dissertation; Ruhr-Universität Bochum; Bochum; Germany.