J. A. Erkoyuncu
Decision Engineering Centre, Cranfield University, Bedfordshire, UK
R. Roy
Decision Engineering Centre, Cranfield University, Bedfordshire, UK
E. Shehab
Decision Engineering Centre, Cranfield University, Bedfordshire, UK
K. Cheruvu
Decision Engineering Centre, Cranfield University, Bedfordshire, UK
A. Gath
BAE Systems, Insyte, Newport Road, Cowes, Isle of Wight
Download articlePublished in: Proceedings of the 2nd CIRP IPS2 Conference 2010; 14-15 April; Linköping; Sweden
Linköping Electronic Conference Proceedings 77:62, p. 481-487
Published: 2012-10-11
ISBN: 978-91-7393-381-0
ISSN: 1650-3686 (print), 1650-3740 (online)
Sufficient consideration of uncertainties is essential for successful Industrial Product Service Systems (IPS2) delivery; due to their potential impact over cost; schedule and performance. The paper serves the purpose of structuring complexity in IPS2 delivery by presenting the main categories and types of uncertainties and their impact on the delivery of IPS2. Detailed description of the uncertainties and their influence on one another is explained. Additionally; the paper defines the complexity implications of these uncertainties on the IPS2 delivery. The findings have been derived from the industrial interactions with four major organisations in the defence and aerospace industries and critically analysing the literature.
Industrial Product-Service Systems; availability contracts; delivery; uncertainty; impact
[1] Erkoyuncu; J. A.; Roy; R.; Shehab; E.; Wardle; P.; 2009; Uncertainty challenges in service cost estimation for products-service systems in the aerospace and defence industries; Proceedings of the 1st CIRP IPS2 Conference; Cranfield; pp. 200- 206.
[2] Ng; I.; Williams; J.; Neely; A.; 2009; Outcomebased contracting: Changing the boundaries of B2B customer relationships; AIM Executive Briefing.
[3] Morelli; N.; 2002; Designing product/service systems: A methodological exploration; Design Issues; 18(3); pp. 3-17.
[4] Baines; T. S.; Lightfoot; H. W.; Evans; S.; Neely; A.; Greenough; R.; Peppard; J.; Roy R.; Shehab E. et al.; 2007; State-of the-art in product-service systems; Proceedings of the Institute of Mechanical Engineers; 221(B10); pp. 1543-1552.
[5] Aurich; J.C.; Fuchs; C.; Wagenknecht; C.; 2006; Life cycle oriented design of technical Product-Service Systems; Journal of Cleaner Production; 14; pp.1480-1494.
[6] Ng; I.; Yip; N.; 2009; Identifying risk and its impact on contracting through a benefit based model framework in business contracting: Case of the Defence industry. Proceedings of the 1st CIRP IPS2 Conference; Cranfield; pp. 207-215.
[7] Takata; S.; Kimura; F.; van Houten; F.J.A.M.; Westkamper; E.; Shpitalni; M.; Ceglarek; D. and Lee; J. 2004; “Maintenance: changing role in life cycle management”; Annals of the CIRP; 53(2); pp. 1-13.
[8] Aurich; J.C.; Wolf; N.; Siener M.; and Schweitzer; E. 2009; Configuration of product-service systems; Journal of Manufacturing Technology Management; 20(5); pp. 591-605.
[9] Mont; O. K.; 2002; Clarifying the concept of product service system; Journal of Cleaner Production; 10; pp. 237-245.
[10] Richter; A.; Sadek; T.; Steven; M.; Welp; E.G.; 2009; Use-oriented business models and flexibility in Industrial Product-Service Systems; Proceedings ofthe 1st CIRP IPS2 Conference; Cranfield; pp. 186- 192.
[11] United States Government Accountability Office (GAO); Cost Estimating and Assessment Guide; Best Practices for Developing and Managing Capital Program Costs; March 2009; [Online] Accessed from: http://legislative.nasa.gov/hearings/3-5- 09%20CostEstimatingAssessGuide.pdf Access date: 02/09/09
[12] Alonso-Rasgado; M. T. & Thompson; G. (2007) A Rapid Design Process for Total Care Product Creation; Journal of Engineering Design; 17; pp. 509-531.
[13] Brezet; J.C.; Bijma; A.;S.; Ehrenfeld; J.; Silvester; S.; 2001; The design of eco-efficient services: Methods; tools and review of the case study based ‘Designing Eco-efficient Services’ project; Design for Sustainability Program; Delft University of Technology
[14] Erkoyuncu; J.A.; Roy; R.; Shehab; E.; Cheruvu; K.; 2009; Managing Uncertainty in Service Cost Estimation for Product-Service Systems; Proceedings of the 7th International Conference on Manufacturing Research (ICMR 2009); Warwick University; Warwick; UK; 8-10 September 2009
[15] Boussabaine A.; Kirkham R.; 2004; Whole Life-cycle Costing: Risk and risk responses; Blackwell Publishing; 1st Edition; pp. 56-81
[16] Roy; R. and Cheruvu; K.S; 2009; A competitive framework for industrial product service systems; International Journal of Internet Manufacturing and Services; 2(1); pp. 4–29.
[17] Grote; G.; 2009; Management of Uncertainty-Theory and Application in the Design of Systems and Organisations; Springer; pp. 29-35.
[18] Smithson; M. 1989; Ignorance and uncertainty; New York: Springer-Verlag; pp. 54-72.
[19] Morelli; N.; 2009; Service as value co-production: reframing the service design process; Journal of Manufacturing Technology Management; 20(5); pp. 568- 590.
[20] Molloy; E.M.; Siemieniuch; C.; Sinclair; M.; 2009; Decision-making systems and the product- toservice shift; Journal of Manufacturing Technology Management; 20(5); pp. 606-625.